Mayor Mark Desire announced today, that the Borough received a $225,000 grant for the reconstruction of McDonald Street from the NJ Department of Transportation.
“The Borough is very pleased with this grant approval from the NJDOT. High Bridge has been very successful obtaining grants for these types of projects over the last few years totaling $1.3 million,” said Mayor Desire.
The Borough has made temporary repairs to ensure the roadway is safe for motorists. The Borough Engineer had already been authorized to create design plans so that construction can begin as soon as possible.
Click here for the NJDOT Grant Award letter.